Per Covenants:
#19 Completion Date:
Any structure begun must be completed within a period of one (1) year from the beginning date, or thereafter completely removed. The side, front, and rear yards of each lot shall be planted with grass, sod, or ground cover, unless otherwise approved by the Architectural Control Committee, within one hundred twenty (120) days after the structure is completed, or the structure is occupied as a residence, whichever is earlier. If the same owner own two or more contiguous lots, the lots shall be maintained in accordance with the provisions. In addition, on wooded lots where there is a separation between the tree line and the curb, all areas between the tree line and the curb must be planed with grass, sod, or ground cover.
Underdeveloped or vacant lots shall be kept free of rubbish and weeds: and grass height shall be maintained at a reasonable length. Upon violation of this provision and after giving the owner ten (10) days notice to cure the condition, the Association, at the option of the Board of Directors, may elect to perform such maintenance at the cost of the owner. The developer shall be exempt from paragraph no. 18, but shall maintain unsold lots at the developer's discretion.